top of page

Catalog
FLOORING
PLUMBING
CABINETS & COUNTER TOPS
Others

Laminate Wood (after).jpg
In this photo we installed the laminate flooring.

Bathroom Tile 45 degree Angle (after
Only a days work

Ceramic Tile (after)
In this photo we replaced the Viynl with Ceramic Tile.

Viynl (before)
In this photo we prepared to remove the Viynl.

Finish
The final photo of the installment

Remove
Preparing for the installment

Plumbing Before.jpg
Beneath Kitche Fosset. Final photo before the after photo.

Leftside Before

Rightside Before

Cabinets, Backsplash and Counter Tops

Photo0391.jpg

Cabinets
In this photo we builded the 9 Cabinet doors, painted, installed them and add heinges..

Renovated Kitchen
Installed 45 degree angled Tile, Granite Tile Counter top and Back Splash

V__C08A.jpg

Cabinets (before)
In this photo there were 9 cabinets missing.

Shoe Shelve
Builded and Installed in less than 1 hour $100 any size

Gutter (after)
A outside cleaned gutter

Ceiling Fan
$35.00 Installion
bottom of page
